Home
Corporate Offices
Contact Us
Corporate Profile
Estimating Calculator
Tech Resources
Gallery
Articles
Service
Maintenance
Company, Inc.
Electrical Contractors
Offset Bending
Enter the offset height in inches:  
Distance:  
Shrink:  
Distance between bends at 10 degrees: (Shrink/Inch = 1/16")  
Distance between bends at 15 degrees: (Shrink/Inch = 1/8")  
Distance between bends at 22.5 degrees: (Shrink/Inch = 3/16")  
Distance between bends at 30 degrees: (Shrink/Inch = 1/4")  
Distance between bends at 45 degrees: (Shrink/Inch = 3/8")  
Distance between bends at 60 degrees: (Shrink/Inch = 1/2")  
Stub Up Bending (Based On EMT)
Enter the stub up height in inches:  
Distance from end of 1/2" conduit to bending mark:  
Distance from end of 3/4" conduit to bending mark:  
Distance from end of 1" conduit to bending mark: